Area B 01

Area B 01 without schematics
Area B 01 without schematics
Area B 01 with schematics
Area B 01 with schematics

NOTE:

THE  DRAWINGS SHOWN BELOW ARE A CONCEPT. FINAL SOLUTIONS OF LAND DIVISION, MATERIALS, CUBATURE SOLUTIONS, ETC., MAY BE REVISED ON A FURTHER STAGE OF THE INVESTMENT PROCESS.

THE PROJECT IS PROTECTED BY COPYRIGHT

PARAMETRES RESULTING FROM THE LOCAL AREA
DEVELOPMENT PLAN RECORD FOR B_01 SECTOR
PARAMETER RATIO
Plot area 100% = 8 365 m²
Floor area and site hard landscape ratio (buildings, hard-paved area, access paths and driveways, car parks) max. 80% = max. 6 685 m²
Soft landscaped area min. 20% = min. 1 671 m²
Parking spaces as compared to:
- Usable area
- Number of work stations
- Number of users
- Transport service stations (KS)

2-5 mp / 100 m²
2-5 mp / 10 w.s.
2-3 mp / 10 u.
2-3 mp / 1 s.s.
Building alignment from border line with local road (KL) 10 m
Maximum building height 18 m
INTENDED LAND USE
PP - production area, manufacturing, processing and technical services
PS - storage and technical services area
KS - transport services area
UX - undefined services area
KP - car parks area
EE - areas and structures of electrical power equipment
PARAMETRES COMPATIBLE WITH GRAPHIC PROPOSAL
OF LAND DEVELOPMENT FOR B_01 SECTOR
PARAMETER AREA / NUMBER


AREA
EQUATION
Plot area 8 356 m² = 100%
Build-up area 2 774 m² = 33%
Soft landscaped area 2 104 m² = 25%
Paved-surface area 3 478 m² = 42%
Usable area (approx. 80% of total build-up area) 2 219 m² = 80% bua
Parking spaces as compared to * :
- Usable area
- Number of work stations
- Number of users
- Transport service stations (KS)
45 mp / 2 219 m² p.u.
45 mp / 225 w.s.
45 mp / 225 u.
45 mp / 22 s.s.
Building alignment from border line with local road 10 m
Building hight 11 m
Cubature 30 514 m³
* - number of parking spaces adopted in relation to usable area (2 np / 100m²)