Skip to main content

Area A 03

Area A 03 without schematics
Area A 03 without schematics
Area A 03 with schematics
Area A 03 with schematics

NOTE:

THE  DRAWINGS SHOWN BELOW ARE A CONCEPT. FINAL SOLUTIONS OF LAND DIVISION, MATERIALS, CUBATURE SOLUTIONS, ETC., MAY BE REVISED ON A FURTHER STAGE OF THE INVESTMENT PROCESS.

THE PROJECT IS PROTECTED BY COPYRIGHT

PARAMETRES RESULTING FROM THE LOCAL AREA
DEVELOPMENT PLAN RECORD FOR A_03 SECTOR
PARAMETER RATIO
Plot area 100% = 13 957 m²
Floor area and site hard landscape ratio (buildings, hard-paved area, access paths and driveways, car parks) max. 80% = max. 11 165,6 m²
Soft landscaped area min. 20% = min. 2 791,4 m²
Parking spaces as compared to:
- Usable area
- Number of work stations
- Number of users
- Transport service stations (KS)
2-5 mp / 100 m²
2-5 mp / 10 s.p.
2-3 mp / 10 u.
2-3 mp / 1 s.o.
Building alignment from border line with local road (KL) 10 m
Maximum building height 18 m
INTENDED LAND USE
PP - production area, manufacturing, processing and technical services
PS - storage and technical services area
KS - transport services area
UX - undefined services area
KP - carparks area
EE - areas and structures of electrical power equipment
PARAMETRES COMPATIBLE WITH GRAPHIC PROPOSAL
OF LAND DEVELOPMENT FOR A_03 SECTOR
PARAMETER AREA / NUMBER


AREA
EQUATION
Plot area 13 957 m² = 100%
Build-up area 4 800 m² = 35%
Soft landscaped area 4 241 m² = 30%
Paved-surface area 4 916 m² = 35%
Usable area (approx. 80% of total build-up area) 3 840 m² = 80% p.z.
Parking spaces as compared to * :
- Usable area
- Number of work stations
- Number of users
- Transport service stations (KS)
77 mp / 3 840 m² p.u.
77 mp / 385 s.p
77 mp / 385 u.
77 mp / 38 s.o.
Building alignment from border line with local road 10 m
Building hight 11 m
Cubature 52 800 m³
* - number of parking spaces adopted in relation to usable area (2 np / 100m²)