Skip to main content

Announcement:

We are pleased to announce that all plots located in Sector A, Area A 02 have been sold.

Area A 02

Area A 02 without schematics
Area A 02 without schematics
Area A 02 with schematics
Area A 02 with schematics

NOTE:

THE  DRAWINGS SHOWN BELOW ARE A CONCEPT. FINAL SOLUTIONS OF LAND DIVISION, MATERIALS, CUBATURE SOLUTIONS, ETC., MAY BE REVISED ON A FURTHER STAGE OF THE INVESTMENT PROCESS.

THE PROJECT IS PROTECTED BY COPYRIGHT

PARAMETRES RESULTING FROM THE LOCAL AREA
DEVELOPMENT PLAN RECORD FOR A_02 SECTOR
PARAMETER RATIO
Plot area 100% = 9 597 m²
Floor area and site hard landscape ratio (buildings, hard-paved area, access paths and driveways, car parks) max. 80% = max. 7 663,2 m²
Soft landscaped area min. 20% = min. 1 933,8 m²
Parking spaces as compared to:
- Usable area
- Number of work stations
- Number of users
- Transport service stations (KS)
2-5 mp / 100 m²
2-5 mp / 10 w.s.
2-3 mp / 10 u.
2-3 mp / 1 s.s.
Building alignment from border line with local road (KL) 10 m
Maximum building height 18 m
INTENDED LAND USE
PP - production area, manufacturing, processing and technical services
PS - storage and technical services area
KS - transport services area
UX - tundefined services area
PARAMETRES COMPATIBLE WITH GRAPHIC PROPOSAL
OF LAND DEVELOPMENT FOR A_02 SECTOR
PARAMETER AREA / NUMBER


AREA
EQUATION
Plot area 9 597 m² = 100%
Build-up area 3 300 m² = 35%
Soft landscaped area 2 159 m² = 24%
Paved-surface area 4 138 m² = 41%
Usable area (approx. 80% of total build-up area) 2 640 m² = 80% bua
Parking spaces as compared to * :
- Usable area
- Number of work stations
- Number of users
- Transport service stations (KS)
53 mp / 2 640 m²
53 mp / 265 w.s
53 mp / 265 u.
53 mp / 26 s.s.
Building alignment from border line with local road 10 m
Building hight 11 m
Building hight 36 300 m³
* - number of parking spaces adopted in relation to usable area (2 np / 100m²)